Great tips. At the onset of explaining various causes of a squeak, Tom Silva says it can be alignment, either of the door-to-hinge, or hinge-to-hinge. Hmm, seems to me those two scenarios different than the case in the vid, that being singular hinge with the barrels out of alignment. So, the vid shows a great solution to fixing out of alignment barrels, but what about fixing doors with hinges out of alignment from each other, or hinges out of alighment on the door? How do you make that determinations, and what is the solution? thx
Before walls and flooring can be added, the basement must first be professionally framed. Framing an unfinished basement can be very expensive; not only will it require a large amount of labor, but material costs are high as well. If you consider all the lumber your contractor will need to lay, plus crossbeams and studs, you will find that lumber is going to be one of the costlier aspects of the project.
Material Costs - In addition to the cost of framing and installing drywall to a basement bathroom, material costs can include: ceiling, flooring, paint, trim, toilet, sink, vanity, all fixtures, tub/shower surround, lighting, and all finishes like towel racks. Plumbing and electrical supplies also factor in to the final budget. Many material costs depend on type of product selected, the brand, and how high-end it is. Heated ceramic floor tiles cost more than basic vinyl tiles.

Installing all of the necessary plumbing and electrical work while walls and floors are unfinished will result in savings.Starting from scratch doesn't require demolition, which can save you around $2,000. Framing may be necessary to define rooms and spaces. System upgrades usually call for minor expansions to the HVAC and electrical systems, but not adding plumbing. The bulk of the cost, however, is in flooring and finishing. After wrapping things up with carpeting, drywall, and ceiling material, you can expect to pay anywhere from $6,500 to $15,500.

"We love that the basement now has a cozy feel yet is very on-trend and modern. It has doubled our square footage with very usable space and given us an additional bedroom and full bathroom. We used a beautiful door from the 1800s to line the wall behind the urinal in the bathroom, and we burned the cabinets in the dry bar and the bathroom countertop with a blowtorch to achieve a unique look. We lightly etched the concrete floors and then used a urethane, making a mirror-like finish that reflects light."

Most cities and towns will require a permit for basement remodels. In addition, there are several codes that dictate what can be done in this area. For example, a basement must have a ceiling height of a minimum of 7-feet. If your basement has a ceiling height lower than this, it may not pass code if remodeled. In addition, plan the cost of the building permits, around $430 on average, into your budget.
Drywall must be applied to any framed basement walls you have and must be applied to any additional walls used to create your basement bedroom. A standard 8’ by 4’ panel will cost between $10 and $20, depending on the thickness. The cost to install these panels varies, but most homeowners report spending around $1.50/sf. The total cost of your project will range between $1,152 and $1,982, with an average cost of $1,915 to install a wall.
Very disappointed in this episode and the direction the show is headed. If you watch old episodes there is more focus on how things are built or fixed. Also focus on the correct way to do things. This episode skips over all the details of building. It is becoming just another fixerup tv show where you show the before, some shots of work being done, and then the finished project. You need to remember your roots of teaching homeowners the correct way to do things, even if they hire contractors to do the work. Your show has been successful for 40 years because you have always stuck to the same core values. It looks as though you are throwing them away to be just like every other show.
×