Finishing a basement ceiling can be a challenge as more than likely, you will need to work around duct, plumbing and electrical work, all while trying to maintain a comfortable room height. A qualified contractor may be able to reroute some of this hardware, but you will more likely lose some headroom to accommodate these fixtures in your finished basement.
If you choose a basic do-it-yourself makeover, including adding moisture control, framing in walls and adding decor and furnishings, your cost will run between $10,000 and $27,000. Waterproofing sealants and additional insulation are just a few of the considerations that will be factored into the final finished basement cost. The price will, of course, also be affected by how much renovating is being done.

When putting a wall over a recently constructed frame, sheetrock is the industry standard for a durable option, that can be painted easily. It can help insulate the room due to its density and generally lasts a long time when maintained. If you’re trying to significantly drive down costs, using paneling for the walls is an effective option. It’s very light, inexpensive and pre-finished in a variety of different sizes and types. Labor costs may also decrease because paneling is easier to transport and work with.
A remodeled basement gives you additional living space without changing the footprint 1 of your home. Basements can be remodeled to become in home theaters, children’s playrooms, entertainment areas, and family game rooms. Because the steps to finish the basement are similar for most of these purposes, you can gain a lot of additional space and use from your home simply by finishing this area.
Before walls and flooring can be added, the basement must first be professionally framed. Framing an unfinished basement can be very expensive; not only will it require a large amount of labor, but material costs are high as well. If you consider all the lumber your contractor will need to lay, plus crossbeams and studs, you will find that lumber is going to be one of the costlier aspects of the project.
Installing all of the necessary plumbing and electrical work while walls and floors are unfinished will result in savings.Starting from scratch doesn't require demolition, which can save you around $2,000. Framing may be necessary to define rooms and spaces. System upgrades usually call for minor expansions to the HVAC and electrical systems, but not adding plumbing. The bulk of the cost, however, is in flooring and finishing. After wrapping things up with carpeting, drywall, and ceiling material, you can expect to pay anywhere from $6,500 to $15,500.
Finished basement on high end house. I designed all of it and spent some time managing the process. Already had lots of windows (walk-out). Used high end materials and design features ( plank laminate flooring with some granite/marble, rope lighting, recessed panels,heavy finish trim molding, recessed lighting, rope lighting, central audio/speakers, full kitchen, full bath,fireplace, zoned HVAC, etc). Took almost 9 months to complete fully. Great finished product.

Basement water leakage can cause serious problems for a homeowner. Standing water can lead to mold growth, which poses health issues. It's also a haven for bugs and other pests. Over time, concrete blocks and foundations can sustain hairline cracks. While they may appear small on the surface, they can be the start of an enormous problem, so early repair is key. The only way to rectify a basement water problem is to remove the water and seal the leaks. This may involve removing existing paint or wall coverings as well as replacing soggy beams.

×